This oversized manhole was part of a complex drainage system tying in 4 separate culverts; some existing and some new. Multiple methods of forming and finishing were utilized to accommodate pipe penetrations and block outs for future culverts. This single box took almost 20,000 pounds of rebar and 60 cubic yards of concrete. With an18”thick top slab spanning20’,we used a bracing plan to support all of the weight and construction activities above.